← Back to CMS Stone
Brembana Milestone S
CMS Stone · Waterjet

3- and 5-axis waterjet cutting system

Benefits

Unmatched cutting performance

Unmatched cutting performance

The monolithic structure with electric gantry offers a sturdy and rigid solution for a speed of 40 m/min and acceleration of 2 m/s2 at the top of the market standards.

Infinite opportunity: savings up to 31% of the cycle time

Infinite opportunity: savings up to 31% of the cycle time

The most compact solution on the market with infinite rotation, 31% less cuttig cycle, avoiding to recover the revolutions of the C axis to align internal wires and tubes.

Smart sealing: safe protection from dust and water

Smart sealing: safe protection from dust and water

Sliding guides enclosed within the machine structure and protected by a machine tool style labirinth, named "Powderfree", avoiding that moisture and abrasive media can damage the motion system.

Up to 75% more productivity

Up to 75% more productivity

The versatility of waterjet to cut a wide range o materials, with custome solutions to increase the productivity up to 75%, like pendulum cycle or the multiple cutting configuration up to 4 independent 3 axis heads.

Brembana Milestone S

brembana milestone s is an advanced, versatile, high-performance waterjet cutting system – either pure water or hydro-abrasive – able to accomodate the most diverse production demands in different application fields, delivering highly accurate cuts even in 3D.

Technical data

X Axis118 in (2 head) 130 in (1 head) / 157 in (2 head) 167 in (1 head)
Y Axis67 in / 79 in
Z Axis14 in with 3 axis head (8 in with 5 axis head)
B Axis±60°
Support Plane146x81 in / 183x81in
Overall dimensions with light barriers197x142 in / 235x154 in
Weight (empty)3600 kg / 4000 kg

Request a quote — Brembana Milestone S

Tell us what you machine and we will help you spec the right equipment, software and service plan.

Call (819) 801-6121

Request information

Tell us about your project. Our Canadian team will get back to you within one business day.